US Highway 41 is being renovated by the State of
Indiana as part of a $10 million project. This is a multi-year project that will
result of the widening of US 41 from 2 lanes to 2 lanes with a center turn lane.
Sidewalks will also be added to both sides of the highway approximately 1 mile from
the Beechwood Park area to Anderson Street.
Quick Links to Photos
January 2007 Photos
May 2007 Photos
July 2007 Photos
August 2007 Photos
September 2007 Photos
October 2007 Photos
September 2007 |
|
|
September 30th |
|
|
|
September 30th.
The west side of US 41 is undergoing daily changes
as the workers try to complete as much as possible
before the Parke County Covered Bridge Festival
begins on October 12th. The following pictures
show US 41 as you travel from South to North. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
September 30th. The following pictures
show US 41 as you travel from North to South. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Back to Top |
|
|
October 2007 |
|
|
October |
|
|
Back to Top |